Samantha Reuter

How Elite’s Scheduling Team Keeps Your Test Program Moving

When a product is ready for testing, the schedule can be just as important as the testing itself. A missed testing window, unavailable equipment, unclear requirements, or a disconnect between program priorities and laboratory resources can create delays that affect an entire development program.

At Elite Electronic Engineering, product testing scheduling involves much more than finding an open date on the calendar. Our Scheduling Team connects customer requirements and timelines with the people, equipment, facilities, and technical expertise needed to keep testing programs moving.

Product Testing Scheduling is More Than Finding an Available Date

Our team works directly with customers to understand project specifications, development plans, testing priorities, project status, deliverables, logistics, and required timelines. From there, we coordinate with our laboratory teams to develop practical schedules that align program needs with the appropriate technical resources.

Managing More Than a Calendar

Elite’s laboratory includes more than 100,000 square feet of testing space, thousands of pieces of equipment, and more than 70 test, software, calibration, and machining engineers and technicians. Our Scheduling Team helps coordinate these resources across a broad range of testing capabilities.

EMC/Electrical Resources

The EMC scheduling team coordinates access to:

  • 18 EMC/EMI chambers, including Whole Vehicle, ALSE, Reverberation, non-anechoic enclosures, and ESD facilities
  • 10 transient and power quality test stations
  • 2 AMETEK PowerWave 250 test systems
  • AMETEK Ripple NX Generator
  • Numerous multi-use laboratory test benches

Environmental, Dynamics & Photometric Resources

Environmental and related scheduling includes:

  • 10 electrodynamic vibration tables
  • HALT/HASS chamber
  • Centrifuge, packaging, drop shock, and SRS equipment
  • Dozens of temperature, altitude, and humidity chambers
  • Salt corrosion, dust, water exposure, solar, and chemical resistance capabilities
  • Multiple universal tensile testing machines
  • Custom life-cycle testing equipment
  • 2-meter integrating sphere
  • 100-foot Type A goniophotometer

Coordinating this many resources requires more than knowing when equipment is available. It requires understanding what each test requires, which resources are appropriate, how testing activities interact with one another, and which technical personnel are needed to execute the work.

Technical Experience Behind the Schedule

Elite’s Scheduling Team brings hands-on laboratory experience to the scheduling process.

The team is led by Adam Rohman, Scheduling Manager, who has been with Elite since 2000. During his career at Elite, Adam has worked as an EMC Test Engineer, Program Manager, Project Manager, and Test Services Scheduler, giving him extensive experience coordinating complex testing programs around customer requirements, timelines, and deliverables.

Adam is joined by Zak Ryan, EMC/Electrical Lab Scheduler, and Micah Rubel, Environmental Stress, Dynamics & Photometric Lab Scheduler.

Zak joined Elite in 2017 and spent nine years as an EMC test engineer within our Automotive department before moving into scheduling. Micah joined Elite in 2023 and brings three years of experience as an Environmental test engineer.

Their technical backgrounds are an important part of the scheduling process. They understand the testing, equipment, laboratory processes, and challenges involved in completing a test program. That experience helps them communicate effectively with both customers and laboratory personnel while keeping the program’s priorities at the center of the schedule.

Matching the Right Resources to the Program

Every test program is different. Some projects require a tight sequence of EMC and environmental testing. Others involve multiple products, changing requirements, complex logistics, or aggressive development schedules.

Our Scheduling Team works to understand those requirements and coordinate the appropriate laboratory resources around them.

This may mean coordinating multiple test departments, reserving specialized equipment, aligning engineering personnel, managing customer logistics, or adjusting a schedule as a program develops. Having all our capabilities available on one campus can be particularly valuable when a program requires multiple types of testing. Instead of managing separate schedules with multiple laboratories, customers can work with Elite’s team to coordinate testing across our facility.

Elite provides EMC/EMI, Environmental Stress, Vibration, Photometric, and Wireless testing, supported by experienced engineering and technical personnel. Our experts can also manage programs remotely when customer personnel do not need to be onsite.

Keeping Your Test Program Moving

Behind every test program is a team of experienced engineers who have seen a wide range of products, requirements, and testing challenges. Our Scheduling Team helps connect those experts and resources with the programs that need them.

The goal is straightforward: Understand the program. Identify the requirements. Coordinate the resources. Manage the logistics. Keep the testing moving.

Whether you’re working against a tight deadline, managing a complex development program, or trying to coordinate multiple testing disciplines, Elite’s Scheduling Team can help develop a practical path forward.

With broad testing capabilities available at one location and an ISO/IEC 17025 accredited laboratory, Elite provides the technical resources, experience, and trusted test data needed to support your program from scheduling through completion.

Have an upcoming project or challenging test schedule? Contact Elite to discuss your requirements and start planning your testing program.

Always Independent in a Changing Testing Industry

As the testing and certification industry continues to consolidate, many independent laboratories have merged with larger corporations and multinational testing networks.

Through these industry changes, Elite Electronic Engineering has remained proudly independent.

More than 70 years since our founding, Elite has thrived as a 100% family-owned, American-operated testing laboratory. Our facilities, equipment, technical teams, and leadership are together in one location in the United States, giving our customers direct access to the people and resources supporting their testing programs.

For U.S. manufacturers, working with Elite offers practical advantages, including easier communication and coordination, clear visibility to testing locations, and certainty that our high-quality results are accepted in the U.S. and worldwide.

This can be particularly important for manufacturers supporting critical U.S. industries, including aerospace, military, and defense programs, where the ownership and location of testing partners factors into supplier and program requirements.

For Elite, remaining family-owned and independent supports a long-term approach to our customer relationships and allows us to continually invest in the people, equipment, and capabilities that are most important to our customers.

When you choose Elite, you choose a proven testing partner committed to your success.

Looking for an independent U.S. testing partner? Contact Elite to discuss your next program.

How to Prepare Your Product for EMC Testing: A Practical Guide

Electromagnetic Compatibility (EMC) testing is a critical step in bringing your electronic product to market. It helps determine whether a device can operate reliably in its intended electromagnetic environment without causing unacceptable interference or be affected by other equipment.

Typical EMC testing can involve:

  • Conducted/Radiated emissions
  • Conducted/Radiated immunity
  • Electrostatic discharge
  • Electrical transients/surges/dropouts

For engineering teams, EMC testing can also become a source of unexpected delays. A product that reaches the laboratory without adequate preparation may require troubleshooting, redesign, additional test time, or a return visit to the lab.

Many of these issues can be reduced through thoughtful preparation before testing begins.

This guide outlines 12 practical steps engineering teams can take to prepare a product for EMC testing, improve test efficiency, and reduce the risk of costly surprises during the compliance process.

1. Understand the Applicable EMC Test Requirements

One of the first steps in preparing for EMC testing is identifying the requirements that apply to your product.

The applicable standards may depend on factors such as:

  • Product type
  • Intended use
  • Industry
  • Operating environment
  • Geographic markets
  • Customer or contractual requirements

Understanding these requirements early gives the engineering team a clearer picture of the conditions the product will need to withstand.

It also helps avoid a frequent problem: discovering late in development that additional tests or product configurations are required.

2. Engage the EMC Test Laboratory Early

The best time to begin discussing EMC testing is often before the product is finished.

Early communication with a qualified EMC test laboratory can help clarify:

  • Which EMC testing standards may apply
  • What test methods will be required
  • How the equipment should be configured
  • What support equipment may be needed
  • How long does testing take
  • What documentation should be prepared
  • Whether preliminary testing would be beneficial

These conversations can also uncover potential complications before formal testing begins, especially for complex products or setups.

3. Define the Product’s Operating Modes

A product may behave very differently depending on how it is operated during testing.

Because EMC testing is intended to evaluate representative or worst-case operating conditions, engineering teams should identify the mode(s) most likely to generate the highest emissions or expose potential susceptibility.

Consider questions such as:

  • Which operating mode produces the highest processor activity?
  • Which configuration creates the most electrical switching?
  • Are wireless transmitters active?
  • Are motors, relays, displays, or other subsystems operating?
  • Are all external interfaces being exercised?
  • Is data actively moving across communication ports?
  • Is there a specific cycle time during which the testing needs to occur?

The goal is to create a test configuration that represents realistic and appropriately demanding product operation.

Providing the laboratory with clearly defined operating modes also makes testing easier to reproduce and document.

4. Prepare All Required Support Equipment

Many products cannot operate independently during testing and may require support equipment to provide the proper loading/external inputs.

Examples of such equipment are:

  • Computers running software or control tools
  • Communication interfaces
  • Loads
  • Simulators
  • Network equipment
  • Specialized cables

Whenever possible, prepare and verify this equipment before arriving at the laboratory so that valuable lab time is not expended on troubleshooting basic system operations.

It is also important to clearly identify which components are part of the equipment under test and which are support equipment.

5. Bring Representative Cables and Accessories

Cables can have a significant impact on EMC performance.

Factors such as cable length, shielding, grounding, routing, and termination can all influence emissions and immunity results.

For this reason, the test configuration should use cables and accessories that accurately represent the intended product installation.

Before testing, verify that you have:

  • Working cable harnesses
  • Correct cable lengths
  • Required connectors and adapters
  • Any required shielded or unshielded configurations

If several cable configurations are possible, discuss them with the test laboratory before the test date.

6. Confirm the Product Is Stable

Formal EMC testing is not the ideal time to discover unrelated product reliability issues.

Before testing, confirm that the equipment can operate continuously in the required test modes.

Look for issues such as:

  • Software crashes
  • Unexpected resets
  • Communication failures
  • Thermal problems
  • Loose connections
  • Intermittent power issues
  • Unstable prototypes

A stable system makes it much easier to determine if a problem observed during testing is related to electromagnetic interference.

7. Establish Clear Pass/Fail Criteria

Immunity testing can sometimes produce effects that are not as simple as “the product stopped working.”

For example, a product may experience:

  • Temporary display changes
  • Communication interruptions
  • Performance degradation
  • Automatic or Operator assisted recovery
  • Data loss
  • A full reset

Before testing begins, the engineering team should understand what constitutes acceptable product behavior.

Clear performance criteria make it easier for both the manufacturer and laboratory to evaluate results consistently.

8. Consider Pre-Compliance Testing

Waiting until formal certification testing to evaluate EMC performance can increase risk.

Pre-compliance testing provides an opportunity to identify potential problems before the product enters its final design phase.

Pre-compliance work may help uncover issues related to:

  • PCB layout
  • Grounding
  • Cable construction
  • Enclosure shielding
  • Power supply noise
  • Filtering
  • Connector design
  • Clock frequencies
  • High-speed digital circuits

The objective is not necessarily to replicate every aspect of a formal compliance test but to help identify significant issues before they become expensive scheduling problems.

9. Prepare Troubleshooting Options

Even a well-designed product can encounter unexpected EMC issues.

Engineering teams should arrive prepared to investigate problems efficiently.

Useful items may include:

  • Spare cables
  • Ferrites
  • Filters
  • Shielding materials
  • Additional grounding hardware
  • Replacement circuit boards
  • Spare units
  • Diagnostic equipment
  • Engineering laptops and software

If design modifications are permitted during developmental testing, having troubleshooting materials available can help engineers quickly evaluate potential solutions.

10. Bring the Right People

When possible, a team member familiar with the product’s design and operation should be available during testing.

This individual should understand:

  • Product hardware
  • Firmware or software
  • Normal operating behavior
  • Interfaces and communication
  • Known design limitations

If a test anomaly occurs, immediate access to knowledgeable engineering personnel can dramatically accelerate troubleshooting.

Even when engineers cannot be physically present, establishing a clear method for quickly contacting the design team can be valuable.

11. Prepare Documentation Before Testing

Providing clear product information helps the laboratory understand the equipment and configure the test correctly.

Useful documentation may include:

  • Product description
  • Block diagrams
  • User manuals
  • Installation instructions
  • Cable information
  • Operating instructions
  • Power requirements
  • Test configurations
  • Software setup instructions
  • Performance criteria
  • Photos or diagrams of intended setups

Well-organized documentation reduces confusion and helps create more repeatable testing.

12. Plan for the Unexpected

EMC testing is ultimately an engineering exercise.

Even products that have undergone extensive design reviews and simulations can behave differently when exposed to a controlled electromagnetic environment.

Engineering teams should therefore build some flexibility into their development schedule to allow for:

  • Troubleshooting
  • Engineering analysis
  • Minor modifications
  • Repeat testing
  • Documentation updates
  • Third-Party conformity and review

Treating EMC testing as an integral part of product development rather than a final administrative step can significantly reduce schedule pressure.

A Practical EMC Pre-Test Checklist

Before your EMC test date, confirm that you have:

  1. Identified the applicable EMC requirements
  2. Discussed the test program with the laboratory
  3. Defined representative operating modes
  4. Verified that the product operates reliably
  5. Prepared all required support equipment
  6. Gathered representative cables and accessories
  7. Defined product performance criteria
  8. Completed appropriate pre-compliance evaluations
  9. Prepared troubleshooting equipment
  10. Confirmed engineering support will be available
  11. Organized product documentation
  12. Allowed time in the project schedule for potential troubleshooting

Successful EMC testing begins long before a product enters the test chamber.

By identifying requirements early, preparing representative equipment, establishing clear operating conditions, and collaborating with the test laboratory throughout development, engineering teams can reduce uncertainty and make the testing process more efficient.

Preparation cannot guarantee that every product will pass on the first attempt. It can, however, make failures easier to diagnose, reduce unnecessary testing delays, and give engineering teams more confidence as they move toward compliance.

For organizations developing electronic products, early EMC planning is not simply a testing activity; it is part of good engineering practice. To learn more about EMC Testing, ask our expert EMC testing team to answer all of your further questions.

What is Solar Radiation Testing and Why is it Important?

What is Solar Radiation Testing?

Solar radiation testing evaluates how products perform when exposed to prolonged sunlight, heat, and UV radiation. By combining controlled thermal heat loads with specific ultraviolet (UV), visible, and infrared light spectrums, laboratory solar simulation reproduces years of outdoor weathering in just days or weeks.

Unlike standard temperature-only tests, solar radiation testing simulates both photochemical effects (UV degradation, fading, brittleness) and thermal effects (heat buildup, warping, expansion).

By capturing both stress factors at once, manufacturers can assess product durability, identify potential design weaknesses, and verify performance before products are exposed to real-world outdoor conditions.

Why is Solar Radiation Testing Important?

Solar radiation testing recreates the effects of sunlight in a controlled laboratory environment by exposing products to carefully defined levels of light and heat. Test profiles can be customized to match specific product requirements, including irradiance (light intensity), temperature, cycling, and exposure duration. By simulating years of outdoor conditions, manufacturers can evaluate how their products will withstand long-term sun exposure and identify potential issues early in the design process.

What Products Benefit from Solar Radiation Testing?

Any product intended for outdoor deployment, high-altitude operations, or exposure to sunlight through window glass requires solar qualification.

Common Applications

  • Digital displays and signage
  • Outdoor electronics
  • Transportation equipment
  • Military and defense systems
  • Aerospace components
  • Renewable energy equipment
  • Enclosures and housings
  • Plastics, coatings, and adhesives

Testing can reveal problems such as fading, discoloration, material degradation, cracking, adhesive failure, or overheating before products are deployed.

Elite’s Solar Radiation Testing Capabilities

Elite Electronic Engineering’s solar radiation testing capabilities are backed by experienced engineers and a full suite of environmental testing services. By offering multiple environmental tests on one campus, we help customers simplify project coordination and streamline product qualification.

Whether you need to meet MIL-STD-810 military specs or custom commercial standards, our team delivers reliable data tailored to your design requirements.

Contact Elite for Solar Radiation Testing

Need to verify your product can withstand years of outdoor exposure? Contact Elite Electronic Engineering to learn how our custom solar radiation testing capabilities can support your next project.

Why Shock Response Spectrum (SRS) Testing Matters

In aerospace, defense, and other high-reliability industries, products must be able to withstand extreme mechanical shock events without compromising performance. Shock Response Spectrum (SRS) Testing is a specialized mechanical shock testing method designed to simulate the high-frequency shock environments components may encounter during launch, deployment, transportation, and other mission-critical events.

At Elite Electronic Engineering, Inc., our SRS testing services help manufacturers verify that their products can endure these demanding conditions before they reach the field. As an experienced shock testing laboratory, we recreate real-world shock profiles in a controlled laboratory environment, we help identify potential weaknesses early in the development process—reducing risk, improving reliability, and supporting compliance with customer and industry requirements.

Whether you’re qualifying a new design or validating product durability, our experienced test engineers work with you to develop SRS testing solutions that meet your specific program requirements.

How Elite’s SRS Testing Services Help You

  • Simulate high-frequency mechanical shock environments
  • Verify product durability and reliability
  • Reduce the risk of field failures
  • Support aerospace, defense, and other stringent qualification requirements

Contact Elite for Shock Response Spectrum Testing

Ready to validate your product’s performance under high-frequency shock conditions? Contact Elite Electronic Engineering to discuss your SRS testing requirements and learn how our team can support your qualification program.

Expanding Our In-House Machining Capabilities with the Haas VF-6 CNC Milling Machine

At Elite Electronic Engineering, we’re always looking for ways to improve the quality, efficiency, and responsiveness of the services we provide. One of the latest investments in our in-house machine facility is helping us do exactly that.

We’re excited to introduce our new Haas VF-6 CNC Milling Machine to our fabrication capabilities.

Enhancing Custom Fixture Fabrication for Vibration & Shock Testing

This new addition significantly enhances our ability to design and fabricate custom fixtures that support our vibration and shock testing services. With a machining travel of 64″ x 32″ x 30″, the Haas VF-6 allows us to machine base plates up to 36″ x 36″ in a single setup. Reducing the number of setups required not only improves machining efficiency but also helps maintain precision throughout the manufacturing process.

What Our Expanded CNC Milling Capabilities Mean for You

By upgrading our in-house machining technology, we can offer direct benefits to our testing customers, including:

  • Faster Turnaround Times: Accelerated production for custom test fixtures keeps your project on schedule.
  • Increased Flexibility: Greater capacity for larger and more complex fixture designs.
  • Unmatched Precision: Improved manufacturing efficiency and machining accuracy.
  • Expanded Testing Support: Enhanced capabilities to support the most demanding vibration and shock testing applications.

Having these capabilities in-house allows our engineering and machining teams to collaborate closely throughout the fixture design and fabrication process. This streamlined workflow enables us to respond quickly to unique testing requirements while maintaining the high quality our customers expect.

Investments like the Haas VF-6 are part of our ongoing commitment to providing comprehensive testing solutions backed by modern equipment and experienced technical staff.

Whether your project requires a standard fixture or a fully customized solution, our expanded machining capabilities help us deliver the precision and performance needed to support successful testing outcomes.

Built for Launch: How Elite Supports Today’s Space Missions

With recent launches from ULA, Artemis II, SpaceX, and Blue Origin, the space industry continues to push forward at an incredible pace. From Low Earth Orbit (LEO) satellite deployments to deep space exploration, every mission depends on hardware that can survive the extreme conditions of launch and space. To support this, Elite Electronic Engineering provides advanced EMC and environmental stress testing for aerospace systems, helping ensure system reliability in mission-critical conditions.

Elite Electronic Engineering has been solving that challenge since the 1950s, beginning with RF immunity testing for high-altitude aerospace systems. Today, we bring that same experience to modern space hardware—supporting satellite systems, launch vehicles, and space-bound electronics through every phase of launch and operation.

Advanced Vibration Testing for Large Space Systems

As spacecraft and payloads have evolved, so have our capabilities.

With the addition of a new 8 ft x 8 ft vibration table, Elite now offers large system vibration testing, enabling realistic launch simulation for:

  • Integrated assemblies
  • Satellite systems
  • Launch vehicle components

This allows manufacturers to replicate liftoff and ascent conditions, ensuring systems can withstand intense vibration and mechanical stress.

Comprehensive Space Hardware Testing Capabilities

From component-level hardware such as sensors and avionics to full-scale, integrated systems and propulsion assemblies, Elite provides testing across the entire spectrum of space-bound equipment.

Space-bound devices we support include:

  • Monitoring systems
  • Sensors
  • Fuel systems and filters
  • Avionics boxes
  • Power sources
  • LED lighting for spacecraft and satellites
  • Solenoid assemblies
  • Electronic instruments
  • Guidance and navigation systems
  • Cable harnesses for space station and satellite applications
  • Propulsion components for spacecraft

Aerospace Testing Services

Elite provides a full suite of aerospace and space qualification testing, including:

These core capabilities support aerospace, space, and defense OEMs and suppliers in meeting demanding industry standards for satellite systems and spaceflight hardware.

As the pace of space innovation accelerates, Elite provides the experience, equipment, and expertise to help ensure your system is ready for launch.

If your product is going to space, Elite can help you get it there. Get in touch with our team or explore our full range of aerospace testing services to learn more.

Automotive EMC Testing & EMC Validation to GMW3097 (2025)

Elite Electronic Engineering is now fully recognized to perform all test methods within the latest General Motors GMW3097 (2025) EMC specification.

Elite is currently the only laboratory in North America recognized for all methods to the 2025 revision, providing automotive suppliers with a single-source solution for General Motors (GM) EMC validation and automotive EMC testing.

GMW3097 defines electromagnetic compatibility requirements and aligns with key automotive EMC standards for electrical and electronic components used in GM vehicles. This includes testing for emissions, immunity, transients, and electrostatic discharge (ESD) to ensure reliable performance in real-world vehicle environments.

What This Means for Your Program

Recognition to GMW3097 (2025) confirms that Elite’s facilities, equipment, and procedures meet GM requirements for complete EMC validation and compliance with modern automotive EMC standards.

For engineering teams, this delivers clear advantages:

  • All GMW3097 methods in one location– no need to coordinate multiple test facilities
  • Testing to the latest 2025 specification – aligned with current GM requirements
  • Recognized results – accepted by GM for EMC validation programs
  • Support for DV and PV testing – from early design through final validation

Supporting Advanced Automotive Electronics

Elite supports EMC validation for a wide range of components, including:

  • ECUs and sensors
  • Power electronics and battery systems
  • Electric drive and high-voltage platforms

By working with a fully recognized automotive EMC test lab, teams can reduce program risk, avoid retesting, and accelerate time to market.

Learn more about our Automotive EMC Testing Services or contact Elite today to discuss your GMW3097 testing requirements.

President’s Post: Be Great

I was given a book “The 50 Greatest Engineers – The people whose innovations have shaped the world” by Paul Virr and William Potter. As engineers, we sometimes do not realize the impact we have on our world. Engineers are a tremendous group that have a life changing effect on everyone. The technologies that engineers have invented help to change and guide the course of human events.

The authors listed many well-known engineers in their list of the 50 greatest engineers. These great engineers are responsible for many of the items that we count on every day.

Thomas Edison: Incandescent Light Bulb, Stock Ticker, First Voice Recording

“Our greatest weakness lies in giving up. The most certain way to succeed is always to try just one more time.”

Alexander Graham Bell: Telephone

“I then shouted … The following sentence: ‘Mr. Watson come here. I want to see you.’ To my delight, he came and declared that he has heard and understood what I said.”

Wilbur and Orville Wright: First Powered Airplane

“The desire to fly is an idea handed down to us by our ancestors who, in their grueling travels across trackless lands in prehistoric times, looked enviously on the birds soaring freely through space, at full speed, above all obstacles, on the infinite highway of the air.”

Other lesser known of the great engineers are listed whose work also had a great influence on humanity.

Michael Faraday: Electric Motors, Carbon Arc Lighthouse Lamps, Faraday Cage

“Nothing is too wonderful to be true, if it be consistent with the laws of nature and in such things as these experiments is the best test of such consistency.”

Guglielmo Marconi: Wireless Telegraph (First Radios)

“Every day sees humanity more victorious in the struggle with space and time”

Granville Woods: Automatic Air brake for trains, “Telegraphony” (combined the principles of telegraphy and telephones, allowing a single wire to carry either voice or telegraph-style Morse code messages).

“His many inventions have shown an amount of skill and dexterity in dealing with the most potent and mysterious of all forces, which places him in the front rank of inventors also.”

Lillian Moller Gilbreth: America’s First Lady of Engineering, The Psychology of Management

“The mental health of the worker not only controls … his physical health but also his desire to work.”

Frank Whittle: Jet Engine

“I’d come to the conclusion that if you wanted to go both fast and far, you’d need to go very high, to heights where the piston engine wouldn’t work and at speeds where the propeller would be very inefficient.”

The authors’ list is limited to 50 but there are countless engineers who fit the category and define what is takes to “Be Great”. Their innovations and contributions have helped mankind by providing practical solutions to real world problems. Behind each of them was an expert team dedicated to a common goal.

At Elite, we strive to “Be Great”.  It is not acceptable to be just “OK” or “good enough”. We work hard to provide our customer service at the highest possible level. We pride ourselves on our expert engineering skills and teamwork to provide a testing experience second to none. And we continuously invest in our people and facilities to be our customers’ most trusted and capable partner.

Happy Holidays from the entire Elite team – and we look forward to serving you in 2026.

Join Elite’s monthly newsletter for the latest on standards, test procedures, fascinating facts, profiles of Elite engineers, and more. Fill out the form below to become part of our global community!

Newsletter Sign Up

By submitting this form, you are consenting to receive marketing emails from: Elite Electronic Engineering, Inc., 1516 Centre Circle Drive, Downers Grove, IL, 60515, US, https://www.elitetest.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact.

Congratulations to Kathy Barri on 32 Remarkable Years with Elite!

Thank You, Kathy Barri,  

For over 32 years, Kathy Barri has been Elite’s receptionist and office assistant.  In June, Kathy will finish her career with Elite and start a well-deserved retirement.  

Although we don’t keep statistics on such matters, Kathy is our Elite person who nearly every visitor over the past 32 years has seen, met, or spoken with, which totals an impressive number of personal connections.  However, her importance to Elite extends beyond our reception desk.  Kathy is a hard-working, reliable, and caring person who consistently offers her assistance and lends support whenever and wherever it is needed.

In addition to answering incoming phone calls and registering visitors, she is the administrative assistant to our finance department and handles a wide range of front-office support tasks. Kathy helps ensure bills are paid, collates labor data, processes a wide range of business documents, and completes many other tasks as needed.  For years she assisted the sales department by preparing proposals.  She also managed registration and logistics for tradeshows where Elite was an exhibitor.  

Kathy is the safety team secretary and has served as our back-up for shipping and report processing.  She initiated and organized first aid and CPR training as well as on-site hearing test programs.  She even helped to wind inductor coils used in customized RF filters that Elite built in the early years.   

She is our go-to person for supporting a positive company culture.  Kathy is our summer picnic organizer, plans the holiday parties, and is instrumental in hosting all the IEEE/SAE corporate events held at our Downers Grove laboratory.  Whenever there was an administrative need, Kathy was always there to take on the task.

When asked, Kathy remarks with pride on Elite’s growth and her appreciation of the family culture espoused by the Klouda family.  She has cherished watching colleagues grow their families, then seeing their sons and daughters mature over time into new employees.  Kathy appreciates the company embrace of hiring siblings, relatives, and trusted friends who join and find meaningful productive careers at Elite.  For Kathy and as with Elite, family is incredibly important, so this part of retiring will be bittersweet for both.  

From all of us, we congratulate Kathy on a career well done.  We will miss our great front-office ambassador, her warm smile, cheerful disposition, and welcoming character.  Best wishes to you and enjoy retirement Kathy!